Procurement
Technical specification, technical and commercial bid comparison on a like-for-like basis, and technical negotiation of the EPC contract, through to an award recommendation ready for signature. A separate fixed-price module.
English summary
Biberger Engineering is an independent engineering firm for grid-connected battery energy storage systems (BESS) from 1 to 250 MW, based in Munich. We work for investors, asset owners and developers, including companies entering the German market: from grid connection through procurement to acceptance.
Who we are
Michael Biberger, M.Sc. in electrical engineering, handles every mandate personally. We therefore take on a limited number of mandates at a time. Specialist partners are brought in as needed, either as our subcontractors with a defined scope or engaged directly by the client.
His personal experience from previous roles includes BESS system design, the design of transformers and substations, the negotiation of grid connection agreements, and two years working in Shanghai with suppliers in China.
We do not accept commissions from manufacturers or suppliers. Manufacturers and EPC contractors are what we review, not our clients.
Three entry points
Each can be commissioned on its own. We review, assess and recommend; decisions stay with you.
Technical specification, technical and commercial bid comparison on a like-for-like basis, and technical negotiation of the EPC contract, through to an award recommendation ready for signature. A separate fixed-price module.
Design reviews, grid connection, FAT and SAT, and an acceptance recommendation. Fixed price per phase. Decisions and formal acceptance remain with the client; an extension with a written power of attorney is available.
A red-flag check before an acquisition, or technical due diligence to an agreed scope. The result is a report with findings, red flags, risks and recommended actions.
Grid connection in Germany
In Germany, BESS are connected under the technical connection rules VDE-AR-N 4110 (medium voltage), 4120 (high voltage) and 4130 (extra-high voltage). The responsible grid operator applies them, often with its own supplementary requirements and procedures.
Connection point, import and export capacity, operating restrictions, deadlines and connection costs.
Conceptual design of transformer and substation, at 110 kV and above together with specialist partners. No detailed drawings.
We request the evidence required under VDE-AR-N 4110/4120/4130 from suppliers and assess it. We do not prepare or certify it.
Technical requirements, interfaces, cost and schedule assumptions, alongside your legal counsel.
How we work
Free of charge, on the status of your project, under NDA if required. It is the basis of our fixed-price offer.
Scope, assumptions and client contributions with agreed deadlines are set out in the offer.
We negotiate technical and commercial content together with your procurement team and legal counsel. Legal review and drafting stay with your counsel.
Site supervision, detailed drawings, and responsibility for schedule and cost.
Contact
Germany is our core market; Austria and Switzerland on request. Please write briefly about project size, grid level and project phase.